participate

Reopening after new construction

Finally it’s time! Finally you can swing, climb and slide again. In cooperation with employees and parents of the school children, the playground could be put back into operation. Site manager Johannes Becker had already built the playground in 2012, at that time still made of wood. Due to the weather and the high termite infestation, however, the substance of the old playground was no longer strong enough and had to be renewed. Instead of wood, a steel frame construction was used. Visually, this may not be able to keep up with the wood version, but it will last for years, if not decades. The children are very happy. Thanks to all the helpers and donors who made this possible.

Leave a Reply

Your email address will not be published. Required fields are marked *